JavaScript is needed for the interactive planner.
The static project summaries below contain the same snapshot.
RheMind · App — Building
Scripture meditation and daily practice, designed to help people carry their learning into everyday life.
App and CMS alignment is in Phase 8. I3 closure and I4 planning are recorded; the first I4 execution round concerns the CMS. App launch acceptance remains open.
Next: Agree the smallest launch scope and sequence the App stories after the shared CMS gate.
RheMind · CMS — Blocked
Editorial system for managing the Scriptures, programmes and practices delivered to the RheMind app.
CMS-I4-001 has local implementation, review and security re-review evidence, and the owner accepted the local behaviour on 29 September. Its feature branch has no pull request and is not pushed to GitHub. Separately, PR #18 (a dependency-audit repair) is open and unmerged; its GitHub Actions runs on 3 and 5 October ended in startup_failure. The chat record attributes this to a payment or spending-limit restriction; GitHub reports only a workflow startup failure.
Next: Confirm why hosted runs fail to start, push the I4-001 branch for exact-PR checks, then complete the CI-rule review, merge and story closure.
RheMind Rhythms — Review needed
Scripture-led music, illustrated lyric videos and channel-growth experiments.
Manna v2 received motion and artwork upgrades; v3 adds a cold open and hook. The 4 October record reports clean layout checks, but no full playback review or final render.
Next: Review the complete Manna sequence with audio, resolve timing or visual issues and agree one export.
Pefiwa — Building
A local-first personal-finance app with an encrypted ledger, bank import and financial understanding tools.
The September E2E record reports registration reaching the email-verification step, a sandbox bank import (5 accounts, 2,115 transactions), manual account and transaction persistence, secure-backup enable and refresh, and 1,231 passing mobile unit/widget tests. Home and later journeys are blocked because the simulator cannot supply App Attest; backup restore, rotation and deletion were not exercised.
Next: Run the remaining authenticated journeys on a suitable signed physical device, then reconcile the v1.1 security and release gates.
Pixesign · PixeOS — Building
Project and delivery-management tooling with governed stories, team workflows and a shared UI system.
The pixeos-lite repository’s feature/ui-refinement-v2 branch has 5 October UI/component commits, and the Pixesign docs branch records them. S2 design preflight passed on 4 October; visual review, Admin approval and the I2 story freeze remain open.
Next: Finish the refined UI review and re-approval, then freeze the next bounded story set.
Ochre & Soul — Review needed
A colour-by-number platform and printable-artwork pipeline centred on culturally grounded scenes.
Phases 0–7 are recorded complete and Phase 8 is open, with I1-S01 first in the frozen implementation sequence. Thirty print briefs and new artwork candidates exist; final artwork and sale gates remain open.
Next: Choose one artwork master, finish its layers and boundaries, and prove the constrained intake-to-offline-colouring slice.
Enact · Intercity reconciliation — Review needed
A controlled August reconciliation of wallet balances, transactions and funding claims.
The corrected workbook is technically ready as a provisional August reconciliation; the previous reviewed workbook defects are closed. Source-owner confirmations still prevent financial sign-off.
Next: Obtain owner evidence for the 6 August posting chronology, the month-end migration interpretation, the apparent additional GHS 1,007 debit and the GHS 728 fee difference, and four unconfirmed funding entries (GHS 3,986,500).
Enact · website — Review needed
Personal and business website experiences for the current Enact brand.
Active planning, copy and design documents are indexed. The local website has May navigation and layout fixes; publication and final client acceptance are not established by the inspected records.
Next: Review the current site against the active Enact copy and confirm the remaining launch content.
App Ideas · validation funnel — Validate
An evidence-led queue for testing small business ideas before committing to delivery.
Evidence-to-Cash has an approved proceed-to-test gate and a prepared test kit; publication/distribution is not established. Four other current ideas await tests; QuoteLoop is explicitly parked.
Next: Choose one bounded demand test and record actual responses or paid commitments before widening the portfolio.
Dweise — Validate
Professional-ready UK records packs, with seller-record and trade-evidence offers under validation.
Seller records has a proceed-to-test gate and operative v2 kit; distribution is a separate decision. September trade/forum research supports narrow workflow tests, but provides no customer or payment validation.
Next: Select either the seller-record test or the trade close-out pilot, define a small success threshold and run that one experiment.
Foundry · Foundsteady — Validate
A financial-support proposition assessed around first bills and shared-household money workflows.
The independent pitch, market, commercial, regulatory and funding assessment was delivered on 23 September. The recommendation is narrow validation before substantial build or external investment.
Next: Resolve the founder assumptions and validate the first-bills/shared-household workflow with a bounded pilot.
AI Biz Ideas — Validate
Research into AI-assisted ecommerce and creator businesses, with trial frameworks.
Dropshipping and AI-influencer workflows were researched in September. The records challenge the source revenue claims and require an audience, time allowance and loss cap before any experiment.
Next: Pick one category and a small test budget; verify costs and samples before creating a business.
DFlow — Maintain
The delivery workflow, governance kit and documentation used across the product projects.
September workflow and overview updates are committed and local validation is recorded. Runtime dispatch and automatic tracker integration are not established by those documentation changes.
Next: Use the existing workflow on one active delivery stream and prioritise only a demonstrated runtime gap.
Project management — Review needed
Portfolio planning and separate delivery baselines for RheMind App/CMS and Rhythms.
The 16 September baselines exist. Capacity, launch scope, cadence and dated milestones still need agreement; late December is an uncommitted target.
Next: Use this dashboard to select weekly capacity and no more than three main priorities, then update the delivery baseline.
Home server · Hayserv / OpenClaw — Maintain
Home-server storage, shares, media services and isolated agent/VM operations.
August storage-connector recovery and September exFAT/Samba compatibility fixes are recorded. The latest server note calls for Finder reconnection testing and planned filesystem/storage maintenance.
Next: Check share writes and backups, then decide whether to schedule the recorded storage migration.
Bible Study — Maintain
Source-led biblical study guides, passage research and material supporting RheMind.
Study DOCX sources and the scriptural-meditation research report are present. The 29 September chat records a delivered 40-passage purpose/work selection.
Next: Choose the next study output and keep passage approval and translation/source boundaries explicit.
Family · spending plan — Maintain
Household spending analysis and an editable conscious-spending plan.
Linked spending reports and a public-site deployment are recorded in August; the main source period is January–March, with later August updates. September chats explore investing separately.
Next: Refresh the spending inputs and review recurring commitments before relying on the old plan.
Wi-Fi Combat — Blocked
A learning/admin platform with role-based E2E and security-review work.
The September review delivered two confirmed control/operational gaps and left five test areas blocked. A developer-facing enablement specification defines the next test-readiness gate.
Next: Obtain the developer readiness package and remediate confirmed control gaps before the next authorised review.
Sybatech — Validate
Corporate website delivery and market research for lending infrastructure and telemedicine.
Local Git history records a v1.1.0 website release. The August Nigerian lending and telemedicine research reports are delivered; no pilot results or customer validation are evidenced in this scan.
Next: Choose one buyer/pilot route from the reports and refresh its time-sensitive inputs before acting.
Aweraxe / AuraX — Validate
Lending-platform proposals and subscription materials for financial institutions.
Proposal artefacts and subscription terms are present; the newer lending-market assessment sits under Sybatech. Customer adoption or operational readiness is not proven by these files.
Next: Confirm the current customer/proposal state and identify one workflow pilot.
HiveMedix — Review needed
A clinician-led digital practice with consultations, patient records, pharmacy and payments.
The August capability brief lists existing functions but also missing public booking, payout setup, subscriptions and self-service channels. Some features await final sign-off.
Next: Confirm acceptance of the listed capabilities and prioritise the booking/payout gaps with the delivery team.
SIISIS — Review needed
An ecommerce storefront, administration backend and mobile workstream.
The Projects checkout is newer than the Dev copy. It has late-August release history and a review record with 1,420 backend tests and 275 web tests passing after fixes.
Next: Use the newer Projects checkout, confirm the deployed version and close remaining prelaunch/acceptance items.
Pixesign OBSim — Building
An Open Banking simulator and scenario controller supporting Pefiwa development.
The status pointer records Phases 1–3 complete, PIX-82’s bbolt store done and intentionally unwired, and PIX-83 as the next engineering story. Hosted beta remains gated.
Next: Reconcile the July pointer with current implementation and tracking before starting PIX-83.
MarkyDee — Building
A desktop Markdown editor with autosave, conflict handling and recovery snapshots.
The May reconciliation records S00–S06 merged, version 0.7.0 and S07 next. A local macOS build is recorded; desktop baseline repair and later desktop/mobile stories remain.
Next: Re-establish the desktop test baseline and confirm S07 is still the next frozen story.
iMAPy — Planned
A cross-platform IMAP backup tool, with a v2 move towards multiple accounts and operational controls.
v1 has a February release baseline. The March v2 plan identifies reusable engine code but requires account-scoped state, scheduling, run history, restore and policy work.
Next: Decide whether v2 is a 2026 priority; if so, start with the account/data-model transition.
SankoDrive — Review needed
A ministry document-governance platform with controlled lifecycle, safe search and public records.
The later July assessment supersedes the scaffold report: 68 stories are reported done on develop, but four high findings and legal/identity/release/deployment pilot gates remain.
Next: Review the high findings and the pilot gates with the owner before planning a release.
Grace Fountain Church — Review needed
Church website/design work, administration planning and a rear-wall/LED design package.
September revision-B schematic and presentation sheets are delivered. The supplier quotation contains cabinet/pixel inconsistencies; construction coordination is outstanding. Website and CHMS artefacts are separate workstreams.
Next: Obtain the supplier’s confirmed LED envelope and construction details; separately confirm website/CHMS priorities.
Awaken The Lion — Review needed
A publishing-first children’s organisation website, catalogue and young-author journey.
July copy, design references and a 20-image editorial library are delivered. Catalogue, imagery and content approvals remain prerequisites to final implementation/publication.
Next: Approve the publishing-first structure and resolve book, submission and consent details.
Tokesi · author website — Maintain
An author website with book, blog, contact and shop pages.
The local static site has January image and cache fixes. Screenshots are present; the README’s live-site URL is a placeholder requiring confirmation.
Next: Confirm the actual deployed site and review the current book/shop content with the author.
Tobi · Purpose & Profession — Review needed
A source-faithful book assessment and proposed youth/adult teaching adaptations.
Phase 1 original and revised reports were delivered and public Pages publication is recorded in July. A custom-domain DNS step and the next production decision were left open.
Next: Confirm the domain status and agree the Phase 2 format and scope before producing the adaptation.
Eku’s Treats — Review needed
Product-label concepts and editable sticker assets for baked goods and Burkina drinks.
Sample circular labels and September Burkina layer assets are present. Product facts, ingredients/allergens and final print approval are still required for commercial release.
Next: Approve one label system and supply verified product/labelling details for finishing.
Viedia — Maintain
Pharmaceutical-company website and product-range presentation.
The 22 May audit records major client corrections resolved on the live site and the local website synchronised from deployment. Later acceptance or live-health evidence was not found.
Next: Check the current site and confirm whether any new client corrections remain.
DeeDash Cabs — Validate
Private-hire website work plus a separately researched driver-on-demand proposition.
Local Astro typography work exists. The July driver-on-demand report recommends a conditional managed pilot, while the August idea queue still says awaiting-test.
Next: Confirm the current cab-site brief; only progress the driver pilot after its licensing, insurance and operating gates.
FGW · photo magnets — Planned
A custom photo-magnet ecommerce workflow: upload, crop, quantity pricing and fulfilment.
Requirements, flow analysis and client clarification questions are present. The associated Dev directory contains no substantive scanned documentation.
Next: Obtain answers on image rules, quantity/pricing, checkout and print fulfilment before implementation.
Cyber-gigs — Validate
A research-led opportunity for a UK SME cyber-resilience readiness service.
The July report and critique favour a narrow service trial over a passive kit. Competitive differentiation and actual demand are still unproven.
Next: Refresh the evidence and choose a clear buyer/deliverable before a small demand test.
Automate · trades service — Planned
An older quote-to-cash and compliance-automation service concept for gas/heating trades.
December 2025 strategy and research briefs exist, but no customer or delivery evidence was found. The newer App Ideas and Dweise work covers overlapping needs.
Next: Compare it with the current trade-evidence pipeline and keep one active experiment.
SarpsZee — Planned
An AI inbox assistant concept that escalates sensitive replies for creator approval.
The February idea analysis is present. No implementation or validated API/business access is evidenced.
Next: Reassess the platform access and creator workflow before giving it delivery time.
The Loom — Planned
An Accra-set children’s story world with a magical loom, character notes and a draft opening.
Series/character development and a first-story draft exist from July 2025. Editorial acceptance and production are not documented.
Next: Decide whether to revive it; if so, review one complete story rather than expanding the universe.
Kwesi · BI teaching — Delivered
Business Intelligence lecture material adapted from supplied outlines.
Designed PowerPoint/PDF lecture artefacts are recorded as delivered in August in two sibling teaching folders.
Next: Confirm whether teaching feedback requires a revision; otherwise keep the delivered deck available.
Personal · income / opportunities — Maintain
Personal income tracking and small digital-business research alongside other personal artefacts.
July income-tracker and opportunity-research completion records are present. No later tracking-input refresh is evidenced.
Next: Refresh the tracker and choose whether any opportunity belongs in the main validation queue.
Enyonam · toolkits — Uncertain
Africa and South Asia toolkit drafts, references and annexes.
Several edited DOCX files and a “Final Draft” folder exist from April. Approval, publication and the operative final version are not established.
Next: Identify the signed-off version and whether any editorial work remains.
James · time capture — Planned
A time-capture workflow discussed with a client, with fleet work treated as secondary.
A September 2025 meeting transcript records discovery. No newer specification or delivery evidence was found.
Next: Confirm whether the client still wants the time-capture project and recover the agreed requirements.
Second brain · Sbrain / Hermes / Accountable — Planned
Related explorations of an AI-supported personal knowledge and accountability system.
Sbrain contains a local HTML prototype; Hermes and Accountable contain source transcripts/mind-map material. No adopted, integrated daily system is evidenced.
Next: Choose one workflow and decide whether these separate explorations should be consolidated.
Instatic · local CMS trial — Review needed
A local OrbStack installation for evaluating the Instatic CMS.
The 19 September note records a healthy installation at the initial “Set Up CMS” screen. Owner/site creation is the next step.
Next: Complete the initial local setup and evaluate one page-publishing workflow.
Miscellaneous production — Maintain
Presentation, copy/design and small operational deliverables that do not yet have a dedicated project.
The August “Emerging as God’s Voice” transition package is delivered. Other historical tasks include local tooling and paused website planning; the folder is not a single product.
Next: Keep only genuine open requests on the weekly plan; file completed assets for reuse.
Open Design — Maintain
An installed design-production tool checkout used for local creative work.
The local main branch remains at a 2 May upstream commit. Source exists; current launcher/runtime health and a safe update assessment were not verified here.
Next: Test the current installed workflow before deciding on an update.
WordPress · shared foundation — Maintain
Reusable local WordPress stacks, starter code and deployment workflow templates.
WPDev and wp_dev contain shared foundation scripts/docs. Their baselines differ and live container health is unverified.
Next: Select the active starter baseline and verify it when needed by a client project.
DelTee · Novamira practice — Review needed
A local WordPress/Novamira test environment and Astra/Spectra page-recreation exercise.
The August term-life page is recorded as a draft. Compatibility limitations with the PostgreSQL adapter and site-bound tools remain recorded.
Next: Finish reviewing the draft page and choose a supported long-term stack if the exercise becomes client work.
Web platform · Laravel foundations — Planned
Reusable Laravel CMS and typed block/page-builder architecture work.
web_dev records a Laravel/Twill default; lfbl-stack records a Filament-to-JSON-to-Blade/Livewire standard. These are architectural proposals, not one completed shared platform.
Next: Choose the immediate client use case before extracting shared packages.
Optiswift / Opticash · legacy sites — Review needed
Earlier financial-infrastructure and remittance marketing-site implementations.
Local static/Next.js site artefacts and historical build results exist. Enact explicitly archives legacy planning; the independent live/client status is unclear.
Next: Confirm whether these remain standalone client projects or historical Enact references.
Agency Hub Pro · legacy prototype — Uncertain
A React agency-management prototype with invoice and service-related code.
The local branch has June 2025 type fixes and a generated Lovable README. No current delivery plan, acceptance or deployment record was found.
Next: Confirm whether it has been superseded by PixeOS before allocating more time.
Developer experiments / reference services — Uncertain
Small local experiments and service scaffolds rather than established delivery projects.
The Supabase demo, Metabase compose file and minimal Slikpe repository exist. node/codex directories contain no substantive scanned project documents.
Next: Retain useful references and confirm an owner/outcome before treating any as active work.
Codex · workflow efficiency — Maintain
Guidance for reducing repeated coordination and review overhead.
A September agent-optimisation document is present. Adoption across projects is not established by the document.
Next: Apply bounded hand-offs and consolidate status updates during existing delivery work.
Vawlet — Uncertain
Empty registered workspace; no local product or status evidence found.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Pixesign VPS — Uncertain
Only a tooling/configuration folder was visible; server provisioning status is unknown.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Cowries / ProcFIN — Uncertain
A ProcFIN pitch Keynote file exists; implementation and commercial state are unknown.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Impacting Health — Uncertain
A logo ZIP exists; no active product or delivery plan was found.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Enyo book — Uncertain
A book-preliminaries Word file exists; editorial or publication state is unverified.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Sankofa · stationery — Uncertain
Letterhead DOCX/PDF artefacts exist; no outstanding work is documented.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Crossroads · stationery — Uncertain
Letterhead variants in DOCX/PDF exist; no acceptance record is present.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
N&S · wedding stationery — Uncertain
Menu, table-card and QR stationery files exist; event delivery/approval is undocumented.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
DBD — Uncertain
Branding assets are present; no reliable project description or current status was found.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Tech — Uncertain
Empty workspace; no actionable local evidence.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
TechThoughts — Uncertain
No substantive local project files were found in the bounded scan.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Shared API contracts — Uncertain
No substantive project documents found; its current ownership is unclear.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Shared decisions — Uncertain
No substantive project documents found; confirm whether this is an unused container.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.
Pefiwa · old scratch workspace — Uncertain
July 2025 setup/progress notes exist; the active Pefiwa implementation is elsewhere.
Assets or a workspace were located, but current active work and acceptance could not be established.
Next: Confirm active, delivered, archived or redundant during the year-end tidy-up.